Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Ensure the meter is set to full range mode.
Ensure the meter is set to full range mode.
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset any lockout conditions and allow the ignition sequence to commence.
Measure voltage across Pin-4 (Brown) and Pin-1 (Blue) of connector X2 (top right corner of PCB).
At rest there should be approx. 30Vdc at the connections which should rise to approx. 60Vdc while sparking.
NOTE:
Sparking should commence at the same time as the fan starts and will last approx. 5seconds then stop for 5seconds, this will repeat 5 times.
Measure voltage across Pin-4 (Brown) and Pin-1 (Blue) of connector X2 (top right corner of PCB).
At rest there should be approx. 30Vdc at the connections which should rise to approx. 60Vdc while sparking.
NOTE:
Sparking should commence at the same time as the fan starts and will last approx. 5seconds then stop for 5seconds, this will repeat 5 times.

Isolate as per TOPs P4
and refit as necessary