Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Ensure there is no demand for either CH or DHW
Gain access to the boilers main terminal strip
Gain access to the boilers main terminal strip
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between terminal marked "sL" to the "MAINS IN" N connection at the mains terminal strip.
With no demand mains voltage should be absent.
With no demand mains voltage should be absent.

Isolate as per TOPs P4
and refit as necessary