Set Appliance State:
Mains Power Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow burner to ignite and establish and boiler to operate for CH demand.
Once the boiler has reached a reasonable temperature switch off the demand, the Fan and Pump should overrun for approximately 4 minutes.
Once the boiler has reached a reasonable temperature switch off the demand, the Fan and Pump should overrun for approximately 4 minutes.